IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0126 # 07 Y:1984 07 1984 INSULATE BARE EQUIPMENT $200 $216 Not Implemented
KU0126 # 08 Y:1984 08 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $184 $140 Implemented
KU0126 # 09 Y:1984 09 1984 REPAIR AND ELIMINATE STEAM LEAKS $196 $150 Implemented
KU0126 # 10 Y:1984 10 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $58 $220 Not Implemented
KU0126 # 11 Y:1984 11 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $59 $40 Implemented
KU0126 # 12 Y:1984 12 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $106 $165 Not Implemented
KU0127 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $47,344 $2,000 Implemented
KU0127 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,100 $1,000 Implemented
KU0127 # 03 Y:1984 03 1984 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,518 $20,000 Implemented
KU0127 # 04 Y:1984 04 1984 OPTIMIZE PLANT POWER FACTOR $18,864 $28,500 Implemented
KU0127 # 05 Y:1984 05 1984 INSTALL SET-BACK TIMERS $8,943 $5,443 Not Implemented
KU0127 # 06 Y:1984 06 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,298 $0 Implemented
KU0127 # 07 Y:1984 07 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,894 $1,350 Not Implemented
KU0127 # 08 Y:1984 08 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,750 $20 Not Implemented
KU0127 # 09 Y:1984 09 1984 USE MINIMUM STEAM OPERATING PRESSURE $3,645 $0 Not Implemented
KU0127 # 10 Y:1984 10 1984 INSULATE BARE EQUIPMENT $1,267 $1,700 Implemented
KU0127 # 11 Y:1984 11 1984 INSTALL TIMERS AND/OR THERMOSTATS $1,116 $300 Implemented
KU0127 # 12 Y:1984 12 1984 REPAIR AND ELIMINATE STEAM LEAKS $187 $60 Implemented
KU0121 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $8,835 $0 Implemented
KU0121 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $376 $200 Not Implemented
KU0121 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,383 $2,250 Implemented
KU0121 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $3,959 $1,000 Implemented
KU0121 # 05 Y:1984 05 1984 COVER OPEN TANKS $2,396 $4,000 Not Implemented
KU0121 # 06 Y:1984 06 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $2,034 $738 Implemented
KU0121 # 07 Y:1984 07 1984 USE MINIMUM SAFE OVEN VENTILATION $474 $0 Implemented