Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0361 # 01 Y:2005 | 01 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,131 | $15,000 | Not Implemented |
SD0361 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,570 | $280 | Implemented |
SD0361 # 03 Y:2005 | 03 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,916 | $144 | Implemented |
SD0361 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $390 | $170 | Implemented |
SD0361 # 05 Y:2005 | 05 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $42,000 | $18,500 | Not Implemented |
SU0209 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,769 | $0 | Implemented |
SU0209 # 02 Y:2005 | 02 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,851 | $0 | Not Implemented |
SU0209 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,742 | $509 | Implemented |
SU0209 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,683 | $418 | Implemented |
SU0209 # 05 Y:2005 | 05 | 2005 | INSTALL TURBULATORS | $1,988 | $500 | Not Implemented |
SU0209 # 06 Y:2005 | 06 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $30,000 | $16,000 | Implemented |
SU0209 # 07 Y:2005 | 07 | 2005 | USE SYNTHETIC LUBRICANT | $1,072 | $1,000 | Implemented |
SU0209 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,558 | $8,908 | Not Implemented |
MA0574 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $179,823 | $140,865 | Implemented |
MA0574 # 02 Y:2005 | 02 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $140,952 | $230,000 | Implemented |
MA0574 # 03 Y:2005 | 03 | 2005 | BURN A LESS EXPENSIVE GRADE OF FUEL | $349,295 | $54,400 | Not Implemented |
MA0574 # 04 Y:2005 | 04 | 2005 | OPTIMIZE PLANT POWER FACTOR | $20,725 | $20,215 | Not Implemented |
MA0574 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $3,466 | $1,801 | Implemented |
MA0574 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $2,911 | $5,770 | Implemented |
MA0574 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $960 | $0 | Implemented |
OK0705 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,953 | $32,150 | Not Implemented |
OK0705 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $978 | $6,015 | Not Implemented |
OK0705 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,199 | $1,007 | Not Implemented |
OK0705 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,908 | $4,618 | Not Implemented |
OK0705 # 05 Y:2005 | 05 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,153 | $14,047 | Not Implemented |