Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0463 # 04 Y:2019 | 04 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,082 | $3,232 | Not Implemented |
AS0463 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,693 | $0 | Implemented |
AS0463 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,398 | $6,295 | Implemented |
AM0771 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,590 | $8,175 | Implemented |
AM0771 # 02 Y:2019 | 02 | 2019 | REPLACE BOILER | $8,200 | $42,760 | Implemented |
AM0771 # 03 Y:2019 | 03 | 2019 | OPTIMIZE PLANT POWER FACTOR | $6,400 | $12,960 | Implemented |
AM0771 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,500 | $1,340 | Implemented |
AM0771 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $950 | $0 | Not Implemented |
AM0771 # 06 Y:2019 | 06 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $300 | $26 | Implemented |
AM0771 # 07 Y:2019 | 07 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $240 | $350 | Not Implemented |
NC0625 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,633 | $59,736 | Implemented |
NC0625 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,983 | $428 | Implemented |
NC0625 # 03 Y:2019 | 03 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $13,098 | $50,000 | Implemented |
NC0625 # 04 Y:2019 | 04 | 2019 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,107 | $3,000 | Not Implemented |
NC0625 # 05 Y:2019 | 05 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,120 | $5,000 | Not Implemented |
SU0474 # 01 Y:2019 | 01 | 2019 | DISCONNECT BALLASTS | $1,094 | $3,500 | Implemented |
SU0474 # 02 Y:2019 | 02 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,517 | $2,500 | Implemented |
SU0474 # 03 Y:2019 | 03 | 2019 | USE PHOTOCELL CONTROLS | $425 | $570 | Implemented |
SU0474 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $357 | $650 | Implemented |
SU0474 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $8,523 | $18,735 | Implemented |
SU0474 # 06 Y:2019 | 06 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,071 | $16,284 | Not Implemented |
CL1901 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,368 | $13,023 | Implemented |
CL1901 # 02 Y:2019 | 02 | 2019 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,260 | $0 | Implemented |
CL1901 # 03 Y:2019 | 03 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,184 | $0 | Implemented |
IP0113 # 01 Y:2019 | 01 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,753 | $0 | Not Implemented |