Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0423 # 04 Y:2012 | 04 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $5,375 | $3,925 | Implemented |
SF0423 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,157 | $5,079 | Not Implemented |
SF0423 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $4,091 | $4,108 | Implemented |
SF0423 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $14,919 | $21,094 | Implemented |
SF0423 # 08 Y:2012 | 08 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $406 | $1,040 | Implemented |
SF0423 # 09 Y:2012 | 09 | 2012 | INSULATE BARE EQUIPMENT | $2,993 | $7,655 | Implemented |
SF0423 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,535 | $127,175 | Implemented |
SF0423 # 11 Y:2012 | 11 | 2012 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $104,307 | $469,980 | Not Implemented |
SF0423 # 12 Y:2012 | 12 | 2012 | RECOVER AND REUSE COOLING WATER | $4,700 | $700 | Implemented |
SF0423 # 13 Y:2012 | 13 | 2012 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $26,214 | $85,490 | Not Implemented |
SF0422 # 01 Y:2012 | 01 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,969 | $0 | Not Implemented |
SF0422 # 02 Y:2012 | 02 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $642 | $43 | Not Implemented |
SF0422 # 03 Y:2012 | 03 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $36,414 | $12,500 | Not Implemented |
SF0422 # 04 Y:2012 | 04 | 2012 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $47,040 | $16,100 | Not Implemented |
SF0422 # 05 Y:2012 | 05 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $662 | $228 | Not Implemented |
SF0422 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,464 | $10,283 | Not Implemented |
SF0422 # 07 Y:2012 | 07 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,287 | $3,924 | Not Implemented |
SF0422 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $1,288 | $3,390 | Not Implemented |
SF0422 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,693 | $31,027 | Not Implemented |
SF0422 # 10 Y:2012 | 10 | 2012 | ADOPT IN-HOUSE MATERIAL GENERATION | $15,798 | $22,322 | Not Implemented |
SD0458 # 01 Y:2012 | 01 | 2012 | REDESIGN PROCESS | $272,976 | $164,279 | Not Implemented |
SD0458 # 02 Y:2012 | 02 | 2012 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $46,732 | $123,300 | Not Implemented |
SD0458 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,502 | $58,740 | Not Implemented |
SD0458 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,833 | $11,000 | Not Implemented |
SD0458 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,667 | $34,450 | Implemented |