IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0330 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $789 $6 Implemented
WV0330 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $508 $105 Implemented
WV0330 # 07 Y:2005 07 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $474 $140 Not Implemented
WV0330 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $95 Implemented
WV0329 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $35,587 $11,800 Implemented
WV0329 # 02 Y:2005 02 2005 COVER OPEN TANKS $19,992 $60,000 Not Implemented
WV0329 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $16,985 $1,088 Not Implemented
WV0329 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,841 $10,360 Implemented
WV0329 # 05 Y:2005 05 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,423 $8,360 Implemented
WV0329 # 06 Y:2005 06 2005 DEVELOP A REPAIR/REPLACE POLICY $6,007 $729 Implemented
WV0329 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,535 $8,398 Implemented
WV0329 # 08 Y:2005 08 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,468 $11,504 Implemented
WV0329 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,268 $0 Implemented
WV0329 # 10 Y:2005 10 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $799 $299 Implemented
WV0329 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $732 $294 Implemented
LE0222 # 01 Y:2005 01 2005 ADD ADDITIONAL PRODUCTION SHIFT $96,000 $5,000 Not Implemented
LE0222 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,410 $49,000 Not Implemented
LE0222 # 03 Y:2005 03 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $5,760 $5,100 Not Implemented
LE0222 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,048 $2,000 Not Implemented
LE0222 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,793 $815 Not Implemented
LE0222 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,752 $200 Not Implemented
LE0222 # 07 Y:2005 07 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $7,800 Not Implemented
LE0222 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $513 $480 Not Implemented
LE0222 # 09 Y:2005 09 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,823 $500 Not Implemented
LE0224 # 01 Y:2005 01 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $95,556 $262,000 Not Implemented