IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0175 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $18,254 $3,320 Implemented
MI0175 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,818 $15,466 Implemented
MI0175 # 03 Y:2009 03 2009 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $7,691 $13,320 Not Implemented
MI0175 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,725 $40 Not Implemented
MI0175 # 05 Y:2009 05 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,127 $2,000 Implemented
MI0175 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,662 $1,210 Not Implemented
UF0419 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,890 $904 Not Implemented
UF0419 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $2,358 $0 Not Implemented
UF0419 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,291 $0 Not Implemented
UF0419 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $490 $0 Not Implemented
UF0419 # 05 Y:2009 05 2009 OPTIMIZE PLANT POWER FACTOR $2,671 $3,405 Not Implemented
UF0419 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $32,995 $9,325 Not Implemented
UF0419 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $112,051 $1,026 Not Implemented
UF0419 # 08 Y:2009 08 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $107,292 $42,500 Not Implemented
UF0419 # 09 Y:2009 09 2009 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $41,483 $4,000 Not Implemented
UF0419 # 10 Y:2009 10 2009 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $2,671 $3,405 Not Implemented
UF0418 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $20,962 $1,500 Not Implemented
UF0418 # 02 Y:2008 02 2008 INSTALL COMMON HEADER ON COMPRESSORS $4,076 $2,560 Implemented
UF0418 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,047 $1,060 Implemented
UF0418 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,106 $0 Not Implemented
UF0418 # 05 Y:2008 05 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,900 $800 Implemented
UF0418 # 06 Y:2008 06 2008 INSTALL TIMERS AND/OR THERMOSTATS $16,637 $30,850 Not Implemented
UF0418 # 07 Y:2008 07 2008 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $3,791 $0 Implemented
UF0418 # 08 Y:2008 08 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $39,146 $1,589 Implemented
UF0418 # 09 Y:2008 09 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $7,856 $809 Implemented