IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0103 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,613 $6,960 Not Implemented
MI0103 # 04 Y:2005 04 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,062 $1,536 Not Implemented
MI0103 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,001 $288 Not Implemented
MI0103 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $556 $486 Not Implemented
LE0210 # 01 Y:2005 01 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,350 $6,560 Not Implemented
LE0210 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,088 $750 Implemented
LE0210 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,616 $2,000 Implemented
LE0210 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,330 $4,866 Implemented
LE0210 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $366 $140 Not Implemented
LE0210 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $80 Implemented
LE0210 # 07 Y:2005 07 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $147 $360 Not Implemented
WV0314 # 01 Y:2005 01 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,732 $3,713 Implemented
WV0314 # 02 Y:2005 02 2005 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,277 $70 Implemented
WV0314 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,828 $0 Implemented
WV0314 # 04 Y:2005 04 2005 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,156 $9,591 Not Implemented
WV0314 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,404 $5,877 Not Implemented
WV0314 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,829 $605 Implemented
WV0314 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,552 $404 Implemented
WV0314 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $105 Implemented
WV0314 # 09 Y:2005 09 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $461 $138 Not Implemented
WV0314 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $426 $358 Not Implemented
WV0314 # 11 Y:2005 11 2005 DEVELOP A REPAIR/REPLACE POLICY $406 $96 Implemented
WV0314 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $215 Not Implemented
WV0314 # 13 Y:2005 13 2005 CONDENSE OPERATION INTO ONE BUILDING $44,003 $60,000 Not Implemented
LE0211 # 01 Y:2005 01 2005 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $52,318 $23,385 Implemented