IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0554 # 04 Y:2010 04 2010 REDUCE FLUID FLOW RATES $6,442 $6,442 Implemented
OR0554 # 05 Y:2010 05 2010 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $6,200 $1,900 Not Implemented
UD0810 # 01 Y:2010 01 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,208 $1,500 Implemented
UD0810 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,919 $1,000 Implemented
UD0810 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $5,338 $32,000 Not Implemented
UD0810 # 04 Y:2010 04 2010 USE RADIANT HEATER FOR SPOT HEATING $5,042 $2,000 Not Implemented
UD0810 # 05 Y:2010 05 2010 METER WASTE WATER $4,167 $1,500 Not Implemented
UD0810 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,405 $2,242 Implemented
UD0810 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,614 $1,000 Implemented
UD0810 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,568 $0 Implemented
UD0810 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $1,834 Implemented
UD0810 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $532 $740 Not Implemented
UD0810 # 11 Y:2010 11 2010 INSTALL OCCUPANCY SENSORS $347 $34 Not Implemented
UD0810 # 12 Y:2010 12 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $200 $500 Not Implemented
BD0366 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $9,620 $210 Implemented
BD0366 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,837 $2,700 Implemented
BD0366 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,342 $1,000 Not Implemented
BD0366 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,922 $0 Not Implemented
BD0366 # 05 Y:2010 05 2010 IMPROVE LUBRICATION PRACTICES $2,368 $600 Implemented
BD0366 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,606 $3,000 Not Implemented
BD0366 # 07 Y:2010 07 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $21,299 $18,000 n/a
BD0366 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,581 $6,400 Implemented
BD0366 # 09 Y:2010 09 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $565 $0 Not Implemented
SF0380 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $360 Implemented
SF0380 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,794 $1,762 Implemented