IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0456 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $5,372 $4,900 Not Implemented
SD0456 # 05 Y:2012 05 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,297 $500 Implemented
SD0456 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,322 $7,503 Implemented
SD0456 # 07 Y:2012 07 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,827 $200 Implemented
SD0456 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,790 $600 Implemented
SD0456 # 09 Y:2012 09 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $2,556 $7,320 Not Implemented
SD0456 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,050 $200 Implemented
SF0420 # 01 Y:2012 01 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $113,599 $0 Not Implemented
SF0420 # 02 Y:2012 02 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,363 $0 Not Implemented
SF0420 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,156 $840 Implemented
SF0420 # 04 Y:2012 04 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $44,796 $12,500 Not Implemented
SF0420 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $936 $555 Implemented
SF0420 # 06 Y:2012 06 2012 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $2,415 $2,286 Not Implemented
SF0420 # 07 Y:2012 07 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $13,612 $13,418 Not Implemented
SF0420 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $53,028 $57,435 Not Implemented
SF0420 # 09 Y:2012 09 2012 BURN A LESS EXPENSIVE GRADE OF FUEL $52,423 $78,900 Not Implemented
SF0420 # 10 Y:2012 10 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,461 $9,543 Not Implemented
SF0420 # 11 Y:2012 11 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $147,442 $498,340 Not Implemented
SF0420 # 12 Y:2012 12 2012 MINIMIZE WATER USAGE $5,598 $0 Not Implemented
SF0420 # 13 Y:2012 13 2012 MINIMIZE WATER USAGE $677 $0 Not Implemented
SF0419 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $80 Implemented
SF0419 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,754 $2,287 Not Implemented
SF0419 # 03 Y:2012 03 2012 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $1,176 $963 Not Implemented
SF0419 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,431 $16,162 Implemented
SF0419 # 05 Y:2012 05 2012 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $8,615 $42,287 Not Implemented