Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0116 # 08 Y:1984 | 08 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $370 | $410 | Not Implemented |
KU0116 # 09 Y:1984 | 09 | 1984 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,065 | $3,200 | Not Implemented |
KU0116 # 10 Y:1984 | 10 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $896 | $2,095 | Not Implemented |
KU0116 # 11 Y:1984 | 11 | 1984 | INSULATE BARE EQUIPMENT | $316 | $60 | Implemented |
KU0116 # 12 Y:1984 | 12 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $264 | $160 | Not Implemented |
KU0117 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,895 | $15,000 | Not Implemented |
KU0117 # 02 Y:1984 | 02 | 1984 | INSTALL TURBULATORS | $4,977 | $2,620 | Not Implemented |
KU0117 # 03 Y:1984 | 03 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,455 | $300 | Not Implemented |
KU0117 # 04 Y:1984 | 04 | 1984 | REPAIR OR REPLACE STEAM TRAPS | $18,415 | $4,200 | Implemented |
KU0117 # 05 Y:1984 | 05 | 1984 | OPTIMIZE PLANT POWER FACTOR | $6,702 | $9,600 | Not Implemented |
KU0117 # 06 Y:1984 | 06 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,430 | $2,900 | Not Implemented |
KU0117 # 07 Y:1984 | 07 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $336 | $500 | Not Implemented |
KU0117 # 08 Y:1984 | 08 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,541 | $4,029 | Implemented |
KU0117 # 09 Y:1984 | 09 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $4,088 | $1,026 | Not Implemented |
KU0117 # 10 Y:1984 | 10 | 1984 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $6,170 | $3,772 | Implemented |
KU0118 # 01 Y:1984 | 01 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,757 | $500 | Implemented |
KU0118 # 02 Y:1984 | 02 | 1984 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $4,332 | $800 | Not Implemented |
KU0118 # 03 Y:1984 | 03 | 1984 | AIR CONDITION ONLY SPACE NECESSARY | $3,948 | $700 | Not Implemented |
KU0118 # 04 Y:1984 | 04 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,032 | $1,400 | Not Implemented |
KU0118 # 05 Y:1984 | 05 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $883 | $0 | Implemented |
KU0118 # 06 Y:1984 | 06 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $866 | $0 | Implemented |
KU0118 # 07 Y:1984 | 07 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $463 | $0 | Implemented |
KU0118 # 08 Y:1984 | 08 | 1984 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $386 | $400 | Not Implemented |
KU0118 # 09 Y:1984 | 09 | 1984 | IMPROVE LUBRICATION PRACTICES | $386 | $500 | Not Implemented |
KU0118 # 10 Y:1984 | 10 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $630 | $55 | Not Implemented |