IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0020 # 08 Y:2002 08 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,853 $1,570 Not Implemented
UU0020 # 09 Y:2002 09 2002 TREAT AND REUSE RINSE WATERS $50,183 $98,800 Not Implemented
SD0293 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,804 $52,000 Implemented
SD0293 # 02 Y:2002 02 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,322 $3,700 Implemented
SD0293 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $5,121 $1,000 Implemented
SD0293 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,238 $280 Implemented
SD0293 # 05 Y:2002 05 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $2,851 $4,092 Not Implemented
SD0293 # 06 Y:2002 06 2002 INCREASE USE OF AUTOMATION $122,000 $45,000 Not Implemented
SD0293 # 07 Y:2002 07 2002 PAY UTILITY BILLS ON TIME $417 $0 Not Implemented
IC0033 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,405 $97,350 Implemented
IC0033 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,622 $5,604 Implemented
IC0033 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,219 $1,700 Implemented
IC0033 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,179 $15,000 Not Implemented
IC0033 # 05 Y:2002 05 2002 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $13,369 $27,400 Not Implemented
IC0033 # 06 Y:2002 06 2002 $43,200 $8,500 Not Implemented
IC0033 # 07 Y:2002 07 2002 USE PLASTIC PALLETS INSTEAD OF WOOD $10,750 $22,000 Implemented
IC0033 # 08 Y:2002 08 2002 ELIMINATE A BY-PRODUCT $6,316 $72,000 Not Implemented
UF0296 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,883 $7,110 Not Implemented
UF0296 # 02 Y:2002 02 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $10,820 $15,547 Not Implemented
UF0296 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,012 $230 Implemented
UF0296 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,442 $10,641 Not Implemented
UF0296 # 05 Y:2002 05 2002 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $13,799 $202,500 Not Implemented
UF0296 # 06 Y:2002 06 2002 METER WASTE WATER $1,066 $1,700 Implemented
UF0296 # 07 Y:2002 07 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $728 $0 Not Implemented
BD0208 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $1,421 $920 Not Implemented