IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0033 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,622 $5,604 Implemented
IC0033 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,219 $1,700 Implemented
IC0033 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,179 $15,000 Not Implemented
IC0033 # 05 Y:2002 05 2002 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $13,369 $27,400 Not Implemented
IC0033 # 06 Y:2002 06 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $43,200 $8,500 Not Implemented
IC0033 # 07 Y:2002 07 2002 USE PLASTIC PALLETS INSTEAD OF WOOD $10,750 $22,000 Implemented
IC0033 # 08 Y:2002 08 2002 ELIMINATE A BY-PRODUCT $6,316 $72,000 Not Implemented
LM0031 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $15,266 $678 Not Implemented
LM0031 # 02 Y:2002 02 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $1,411 $3,420 Not Implemented
LM0031 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $244 $0 Not Implemented
LM0031 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,486 $44,650 Not Implemented
LM0031 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,152 $100 Implemented
LM0031 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $614 $20 Implemented
LM0031 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,421 $11,800 Implemented
LM0031 # 08 Y:2002 08 2002 DEVELOP STANDARD OPERATING PROCEDURES $19,915 $8,440 Implemented
LM0031 # 09 Y:2002 09 2002 DEVELOP STANDARD OPERATING PROCEDURES $47,795 $4,337 Implemented
LM0031 # 10 Y:2002 10 2002 SCHEDULE DELIVERIES ACCORDING TO DEMAND $11,826 $1,000 Not Implemented
AS0320 # 01 Y:2002 01 2002 INSTALL SKYLIGHTS $2,558 $9,946 n/a
AS0320 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,651 $6,651 n/a
AS0320 # 03 Y:2002 03 2002 REDUCE VENTILATION AIR $2,184 $1,320 n/a
AS0320 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,123 $7,350 n/a
AS0320 # 05 Y:2002 05 2002 USE SYNTHETIC LUBRICANT $645 $465 n/a
AS0320 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,380 $60 n/a
AS0320 # 07 Y:2002 07 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,932 $60 n/a
AS0320 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,971 $374 n/a