IAC logo
IAC Assessment: LM0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2002
Principal Product plastic injection molded parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 38,000
Annual Production 7,500,000 Pounds
Production Hrs. Annual 8,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $407,334 6,187,144 kWh $0.07
Electricity Demand $72,320 12,359 kW-months/year $5.85
Electricity Fees $58,089 - $ -
TOTAL ENERGY COSTS $537,743
RECOMMENDED SAVINGS* $125,130 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,897
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ %
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$15,266
Cost:
$678
$13,478 187,086 $1,788 268 - - - - - - - - $13,478
187,086
kWh
$1,788
268
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,411
Cost:
$3,420
$1,242 17,237 $169 25 - - - - - - - - $1,242
17,237
kWh
$169
25
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$244
Cost:
-
$193 2,682 $51 7 - - - - - - - - $193
2,682
kWh
$51
7
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,486
Cost:
$44,650
$18,086 251,059 $2,400 359 - - - - - - - - $18,086
251,059
kWh
$2,400
359
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,152
Cost:
$100
$1,017 14,112 $135 20 - - - - - - - - $1,017
14,112
kWh
$135
20
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$614
Cost:
$20
$542 7,520 $72 11 - - - - - - - - $542
7,520
kWh
$72
11
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,421
Cost:
$11,800
- - - - $6,421 - - - - - - - -
-
kWh
-
-
kW-months/year
$6,421
-
lb
-
-
$
-
-
$
-
-
%
08: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$19,915
Cost:
$8,440
- - - - - - - - - - $19,915 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$19,915
-
%
09: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$47,795
Cost:
$4,337
- - - - - - - - $47,795 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$47,795
-
$
-
-
%
10: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$11,826
Cost:
$1,000
- - - - - - $11,826 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$11,826
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$125,130
Cost:
$74,445
$34,558 479,696 $4,615 690 $6,421 - $11,826 - $47,795 - $19,915 - $34,558
479,696
kWh
$4,615
690
kW-months/year
$6,421
-
lb
$11,826
-
$
$47,795
-
$
$19,915
-
%
TOTAL IMPLEMENTED Savings:
$75,897
Cost:
$24,697
$1,559 21,632 $207 31 $6,421 - - - $47,795 - $19,915 - $1,559
21,632
kWh
$207
31
kW-months/year
$6,421
-
lb
-
-
$
$47,795
-
$
$19,915
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product Increase in Production