IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0211 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $23,185 $7,550 Not Implemented
LE0211 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $19,652 $12,710 Not Implemented
LE0211 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,558 $3,000 Not Implemented
LE0211 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,348 $2,355 Not Implemented
LE0211 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,667 $1,070 Not Implemented
LE0211 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,128 $16,472 Implemented
LE0211 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $384 $300 Not Implemented
LM0095 # 06 Y:2005 06 2005 INCREASE AMOUNT OF CONDENSATE RETURNED $67,226 $100,000 Not Implemented
LM0095 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $749 $100 Implemented
LM0095 # 08 Y:2005 08 2005 MODIFY STARTUP/SHUTDOWN TIMES $101,277 $1,000 Implemented
LM0095 # 09 Y:2005 09 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $115,000 $3,000 Implemented
LM0095 # 10 Y:2005 10 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $23,750 $1,000 Implemented
LM0095 # 11 Y:2005 11 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $46,875 $50,000 Implemented
LM0095 # 12 Y:2005 12 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $50,000 $50,000 Not Implemented
LM0095 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $93,378 $1,200 Implemented
LM0095 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,900 $2,262 Implemented
LM0095 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,871 $750 Implemented
LM0095 # 04 Y:2005 04 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $376 $0 Not Implemented
LM0095 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,202 $750 Not Implemented
WV0313 # 01 Y:2005 01 2005 REPAIR OR REPLACE STEAM TRAPS $94,235 $1,000 Implemented
WV0313 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,522 $10,250 Not Implemented
WV0313 # 03 Y:2005 03 2005 OPERATE BOILERS ON HIGH FIRE SETTING $27,626 $5,110 Not Implemented
WV0313 # 04 Y:2005 04 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $21,789 $110 Not Implemented
WV0313 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $15,992 $3,200 Implemented
WV0313 # 06 Y:2005 06 2005 MINIMIZE WATER USAGE $14,331 $13,600 Not Implemented