IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0102 # 02 Y:2013 02 2013 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $25,460 $100 Implemented
DL0102 # 03 Y:2013 03 2013 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,740 $100 Not Implemented
DL0102 # 04 Y:2013 04 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,500 $510 Not Implemented
DL0102 # 05 Y:2013 05 2013 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,300 $37,600 Not Implemented
DL0102 # 06 Y:2013 06 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $320 $185 Not Implemented
SU0338 # 01 Y:2013 01 2013 PAY BILLS ON TIME TO AVOID LATE FEES $3,233 $0 Implemented
SU0338 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $111,890 $4,878 Not Implemented
SU0338 # 03 Y:2013 03 2013 MODIFY WORKLOAD $80,009 $2,213 Not Implemented
SU0338 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,567 $2,727 Implemented
SU0338 # 05 Y:2013 05 2013 ELIMINATE/REDUCE AN OPERATION $11,039 $5,760 Not Implemented
SU0338 # 06 Y:2013 06 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $513 $294 Not Implemented
SU0338 # 07 Y:2013 07 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $59 $46 Implemented
SU0338 # 08 Y:2013 08 2013 REDUCE VENTILATION AIR $3,034 $5,294 Not Implemented
SU0338 # 09 Y:2013 09 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,693 $15,784 Not Implemented
SU0338 # 10 Y:2013 10 2013 UPGRADE OBSOLETE EQUIPMENT $64 $224 Implemented
OK0845 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,354 $12,299 Implemented
OK0845 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $90 $366 Not Implemented
OK0845 # 03 Y:2013 03 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,271 $3,608 Not Implemented
OK0845 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Not Implemented
OK0845 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,941 $550 Implemented
OK0845 # 06 Y:2013 06 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $318 $1,584 Implemented
OK0845 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,780 $1,378 Not Implemented
OK0845 # 08 Y:2013 08 2013 USE RADIANT HEATER FOR SPOT HEATING $20,678 $90,000 Not Implemented
OK0845 # 09 Y:2013 09 2013 OPTIMIZE PLANT POWER FACTOR $2,148 $7,526 Not Implemented
LE0361 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,204 $3,144 Not Implemented