Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0419 # 06 Y:2012 | 06 | 2012 | HEAT WATER WITH EXHAUST HEAT | $5,628 | $35,328 | Not Implemented |
SD0455 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,382 | $200 | Not Implemented |
SD0455 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,441 | $5,300 | Not Implemented |
SD0455 # 03 Y:2012 | 03 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,465 | $2,530 | Not Implemented |
SD0455 # 04 Y:2012 | 04 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $706 | $252 | Not Implemented |
SD0455 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $1,808 | $1,295 | Not Implemented |
SD0455 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $5,541 | $4,213 | Not Implemented |
SD0455 # 07 Y:2012 | 07 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,146 | $3,112 | Not Implemented |
SD0455 # 08 Y:2012 | 08 | 2012 | INSULATE FEEDWATER TANK | $2,266 | $2,574 | Not Implemented |
SD0455 # 09 Y:2012 | 09 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,156 | $7,124 | Not Implemented |
SD0455 # 10 Y:2012 | 10 | 2012 | USE PHOTOCELL CONTROLS | $1,606 | $2,550 | Not Implemented |
SD0453 # 01 Y:2012 | 01 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,250 | $200 | Implemented |
SD0453 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,500 | $200 | Implemented |
SD0453 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,950 | $200 | Implemented |
SD0453 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,913 | $2,000 | Implemented |
SD0453 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $49,200 | $24,400 | Implemented |
SD0453 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,400 | $25,600 | Not Implemented |
SD0453 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,700 | $12,150 | Implemented |
SD0454 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,512 | $200 | Implemented |
SD0454 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,236 | $2,700 | Implemented |
SD0454 # 03 Y:2012 | 03 | 2012 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $6,156 | $2,000 | Not Implemented |
SD0454 # 04 Y:2012 | 04 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,354 | $2,350 | Not Implemented |
SD0454 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $14,303 | $13,546 | Implemented |
SD0454 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,826 | $6,000 | Not Implemented |
SD0454 # 07 Y:2012 | 07 | 2012 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $28,169 | $55,000 | Not Implemented |