Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0214 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,637 | $5,500 | Implemented |
LE0214 # 03 Y:2005 | 03 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,017 | $320 | Implemented |
LE0214 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,291 | $640 | Not Implemented |
LE0214 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,259 | $2,300 | Implemented |
LE0214 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,575 | $500 | Implemented |
LE0212 # 01 Y:2005 | 01 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $600,960 | $1,440,000 | Not Implemented |
LE0212 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $38,827 | $28,400 | Implemented |
LE0212 # 03 Y:2005 | 03 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,161 | $2,500 | Not Implemented |
LE0212 # 04 Y:2005 | 04 | 2005 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $13,784 | $37,000 | Not Implemented |
LE0212 # 05 Y:2005 | 05 | 2005 | IMPROVE COMBUSTION CONTROL CAPABILITY | $9,210 | $1,000 | Not Implemented |
LE0212 # 06 Y:2005 | 06 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $6,490 | $1,925 | Implemented |
LE0212 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,111 | $1,500 | Implemented |
LE0212 # 08 Y:2005 | 08 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,055 | $350 | Implemented |
LE0212 # 09 Y:2005 | 09 | 2005 | COVER OPEN TANKS | $2,850 | $2,274 | Not Implemented |
LE0212 # 10 Y:2005 | 10 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,712 | $200 | Implemented |
LE0212 # 11 Y:2005 | 11 | 2005 | BURN WASTE OIL FOR HEAT | $1,823 | $3,000 | Not Implemented |
SU0209 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,769 | $0 | Implemented |
SU0209 # 02 Y:2005 | 02 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,851 | $0 | Not Implemented |
SU0209 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,742 | $509 | Implemented |
SU0209 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,683 | $418 | Implemented |
SU0209 # 05 Y:2005 | 05 | 2005 | INSTALL TURBULATORS | $1,988 | $500 | Not Implemented |
SU0209 # 06 Y:2005 | 06 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $30,000 | $16,000 | Implemented |
SU0209 # 07 Y:2005 | 07 | 2005 | USE SYNTHETIC LUBRICANT | $1,072 | $1,000 | Implemented |
SU0209 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,558 | $8,908 | Not Implemented |
LE0209 # 01 Y:2005 | 01 | 2005 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $669,800 | $350,000 | Not Implemented |