IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0313 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,376 $900 Implemented
WV0313 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $4,952 $1,322 Implemented
WV0313 # 09 Y:2005 09 2005 DEVELOP A REPAIR/REPLACE POLICY $3,756 $1,320 Implemented
WV0313 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,479 $110 Implemented
WV0313 # 11 Y:2005 11 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,420 $1,000 Implemented
WV0313 # 12 Y:2005 12 2005 USE SYNTHETIC LUBRICANT $2,220 $620 Implemented
WV0313 # 13 Y:2005 13 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,101 $0 Not Implemented
WV0313 # 14 Y:2005 14 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,447 $1,050 Not Implemented
SD0359 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,184 $24,750 Not Implemented
SD0359 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,898 $600 Implemented
SD0359 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,830 $0 Not Implemented
SD0359 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,400 $0 Implemented
SD0359 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,599 $1,388 Implemented
SD0359 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,417 $59,829 Implemented
SD0359 # 07 Y:2005 07 2005 INSTALL SKYLIGHTS $1,046 $800 Not Implemented
SD0359 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $102 $100 Implemented
SD0359 # 09 Y:2005 09 2005 REUSE / RECYCLE/ SELL PAPER PRODUCTS $8,102 $0 Not Implemented
SD0359 # 10 Y:2005 10 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,882 $0 Implemented
TA0092 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,280 $2,300 Not Implemented
TA0092 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,280 $1,300 Implemented
TA0092 # 03 Y:2005 03 2005 AIR CONDITION ONLY SPACE NECESSARY $3,580 $5 Implemented
TA0092 # 04 Y:2005 04 2005 REDUCE OR ELIMINATE WASTE $2,710 $36 Implemented
TA0092 # 05 Y:2005 05 2005 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,200 $111 Not Implemented
TA0092 # 06 Y:2005 06 2005 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $1,140 $0 Implemented
TA0092 # 07 Y:2005 07 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $535 $155 Not Implemented