Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0313 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,376 | $900 | Implemented |
WV0313 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $4,952 | $1,322 | Implemented |
WV0313 # 09 Y:2005 | 09 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $3,756 | $1,320 | Implemented |
WV0313 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,479 | $110 | Implemented |
WV0313 # 11 Y:2005 | 11 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,420 | $1,000 | Implemented |
WV0313 # 12 Y:2005 | 12 | 2005 | USE SYNTHETIC LUBRICANT | $2,220 | $620 | Implemented |
WV0313 # 13 Y:2005 | 13 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,101 | $0 | Not Implemented |
WV0313 # 14 Y:2005 | 14 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,447 | $1,050 | Not Implemented |
SD0359 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,184 | $24,750 | Not Implemented |
SD0359 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,898 | $600 | Implemented |
SD0359 # 03 Y:2005 | 03 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,830 | $0 | Not Implemented |
SD0359 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,400 | $0 | Implemented |
SD0359 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,599 | $1,388 | Implemented |
SD0359 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,417 | $59,829 | Implemented |
SD0359 # 07 Y:2005 | 07 | 2005 | INSTALL SKYLIGHTS | $1,046 | $800 | Not Implemented |
SD0359 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $102 | $100 | Implemented |
SD0359 # 09 Y:2005 | 09 | 2005 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $8,102 | $0 | Not Implemented |
SD0359 # 10 Y:2005 | 10 | 2005 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,882 | $0 | Implemented |
TA0092 # 01 Y:2005 | 01 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,280 | $2,300 | Not Implemented |
TA0092 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,280 | $1,300 | Implemented |
TA0092 # 03 Y:2005 | 03 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $3,580 | $5 | Implemented |
TA0092 # 04 Y:2005 | 04 | 2005 | REDUCE OR ELIMINATE WASTE | $2,710 | $36 | Implemented |
TA0092 # 05 Y:2005 | 05 | 2005 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,200 | $111 | Not Implemented |
TA0092 # 06 Y:2005 | 06 | 2005 | SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON | $1,140 | $0 | Implemented |
TA0092 # 07 Y:2005 | 07 | 2005 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $535 | $155 | Not Implemented |