IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0186 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,110 $2,000 Implemented
CO0186 # 07 Y:1990 07 1990 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $665 $100 Implemented
CO0186 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $331 $800 Implemented
CO0186 # 09 Y:1990 09 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,400 $3,550 Implemented
CO0186 # 10 Y:1990 10 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,370 $4,900 Implemented
CO0187 # 01 Y:1990 01 1990 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,200 $28,000 Implemented
CO0187 # 02 Y:1990 02 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,370 $12,000 Implemented
CO0187 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $6,340 $15,000 Implemented
CO0187 # 04 Y:1990 04 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,000 $1,200 Implemented
CO0187 # 05 Y:1990 05 1990 MINIMIZE WATER USAGE $1,570 $1,100 Implemented
CO0187 # 06 Y:1990 06 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $935 $1,700 Not Implemented
CO0187 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $830 $1,000 Implemented
CO0187 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $576 $267 Implemented
CO0184 # 01 Y:1990 01 1990 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $7,600 $500 Implemented
CO0184 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,500 $4,000 Implemented
CO0184 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,630 $12,700 Not Implemented
CO0184 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $8,590 $1,300 Implemented
CO0184 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,320 $3,670 Not Implemented
CO0184 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,280 $2,100 Implemented
CO0184 # 07 Y:1990 07 1990 OPTIMIZE PLANT POWER FACTOR $18,190 $20,700 Not Implemented
CO0185 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,780 $750 Implemented
CO0185 # 02 Y:1990 02 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,370 $13,700 Not Implemented
CO0185 # 03 Y:1990 03 1990 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,390 $200 Implemented
CO0185 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,620 $50 Implemented
CO0185 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,010 $300 Implemented