IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0668 # 01 Y:2003 01 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $48,976 $0 Not Implemented
UD0668 # 02 Y:2003 02 2003 IMPROVE SPACE COMFORT CONDITIONING $40,000 $44,000 Not Implemented
UD0668 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,018 $37,750 Not Implemented
UD0668 # 04 Y:2003 04 2003 ADD AREA LIGHTING SWITCHES $11,320 $7,350 Not Implemented
UD0668 # 05 Y:2003 05 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,612 $1,000 Not Implemented
UD0668 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,423 $200 Not Implemented
UD0668 # 07 Y:2003 07 2003 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,380 $0 Not Implemented
UD0668 # 08 Y:2003 08 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,834 $1,382 Not Implemented
UD0668 # 09 Y:2003 09 2003 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $2,248 $7,000 Not Implemented
UD0668 # 10 Y:2003 10 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,723 $2,000 Not Implemented
UD0668 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,224 $2,747 Not Implemented
UD0668 # 12 Y:2003 12 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $730 $0 Not Implemented
UD0668 # 13 Y:2003 13 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $610 $642 Not Implemented
UD0668 # 14 Y:2003 14 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,071 $0 Not Implemented
UD0668 # 15 Y:2003 15 2003 DISCONNECT BALLASTS $260 $60 Not Implemented
UD0668 # 16 Y:2003 16 2003 COVER OPEN TANKS $253 $200 Not Implemented
UD0668 # 17 Y:2003 17 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $227 $45 Not Implemented
LM0059 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $634 $310 Not Implemented
LM0059 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $298 $120 Implemented
LM0059 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $402 $150 Not Implemented
LM0059 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $245 $145 Not Implemented
LM0059 # 05 Y:2003 05 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,308 $5,000 Not Implemented
LM0059 # 06 Y:2003 06 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,238 $11,000 Not Implemented
LM0059 # 07 Y:2003 07 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,160,984 $1,000,000 Not Implemented
LM0059 # 08 Y:2003 08 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $17,902 $10,000 Implemented