IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0440 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $1,250 Implemented
UM0440 # 08 Y:2014 08 2014 RECOVER WASTE HEAT FROM EQUIPMENT $958 $750 Implemented
WM0039 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,902 $6,088 Not Implemented
WM0039 # 02 Y:2014 02 2014 UPGRADE CONTROLS ON COMPRESSORS $12,671 $14,500 Implemented
WM0039 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $936 $2,015 Not Implemented
WM0039 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,304 $5,162 Not Implemented
WM0039 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $3,010 Not Implemented
WM0039 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $330 $208 Not Implemented
WM0039 # 07 Y:2014 07 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $3,724 $4,550 Not Implemented
WM0039 # 08 Y:2014 08 2014 USE SYNTHETIC LUBRICANT $26,656 $5,209 Implemented
NC0507 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,167 $23,000 Not Implemented
NC0507 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $16,846 $43,969 Not Implemented
NC0507 # 03 Y:2014 03 2014 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $51,724 $62,000 Not Implemented
NC0507 # 04 Y:2014 04 2014 KEEP BOILER TUBES CLEAN $6,811 $2,000 Implemented
NC0507 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $806 $650 Not Implemented
NC0507 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $264 $50 Implemented
NC0507 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $1,828 $1,018 Not Implemented
NC0507 # 08 Y:2014 08 2014 USE PHOTOCELL CONTROLS $72 $80 Not Implemented
NC0507 # 09 Y:2014 09 2014 DEVELOP A REPAIR/REPLACE POLICY $2,801 $10,912 Implemented
AM0651 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,615 $1,485 Implemented
AM0651 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,525 $400 Implemented
AM0651 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $1,500 Implemented
AM0651 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,745 $735 Implemented
AM0651 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,725 $500 Implemented
AM0651 # 06 Y:2014 06 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,950 $0 Implemented