IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0416 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,478 $0 Implemented
SF0416 # 02 Y:2012 02 2012 COMBINE UTILITY METERS $2,336 $1,600 Not Implemented
SF0416 # 03 Y:2012 03 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,287 $2,705 Not Implemented
SF0416 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,614 $18,273 Implemented
SF0415 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $77,652 $5,000 Not Implemented
SF0415 # 02 Y:2012 02 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,634 $8,163 Implemented
SF0415 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $136,139 $189,204 Implemented
SF0415 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,606 $11,795 Not Implemented
SF0415 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $3,106 $10,756 Implemented
SF0415 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,582 $28,175 Implemented
SF0415 # 07 Y:2012 07 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,835 $60,972 Implemented
SF0415 # 08 Y:2012 08 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,277 $149,347 Implemented
SF0415 # 09 Y:2012 09 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $95,167 $0 Implemented
SD0450 # 01 Y:2012 01 2012 USE MINIMUM STEAM OPERATING PRESSURE $8,111 $200 Not Implemented
SD0450 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,795 $200 Not Implemented
SD0450 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,833 $1,900 Not Implemented
SD0450 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $1,297 $3,550 Not Implemented
SD0450 # 05 Y:2012 05 2012 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,500 $25,000 Not Implemented
SF0414 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,448 $0 Not Implemented
SF0414 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $923 $0 Implemented
SF0414 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $0 Implemented
SF0414 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,223 $382 Not Implemented
SF0414 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,314 $38,630 Not Implemented
SF0414 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85,494 $200,504 Not Implemented
SF0414 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $39,049 $165,422 Not Implemented