IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0186 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $700 n/a
UM0186 # 07 Y:2001 07 2001 OPTIMIZE PLANT POWER FACTOR $1,500 $2,300 n/a
UM0186 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $1,000 n/a
WI0394 # 01 Y:2001 01 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $32,472 $1,611 n/a
WI0394 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,875 $34,038 n/a
WI0394 # 03 Y:2001 03 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,800 $0 n/a
WI0394 # 04 Y:2001 04 2001 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,549 $9,975 n/a
WI0394 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,778 $2,000 n/a
WI0394 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,579 $1,280 n/a
WI0394 # 07 Y:2001 07 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,450 $1,263 n/a
WI0394 # 08 Y:2001 08 2001 RECOVER AND REUSE COOLING WATER $1,183 $5,250 n/a
AM0398 # 01 Y:2001 01 2001 CHECK FOR ACCURACY OF UTILITY / POWER METERS $0 $0 Implemented
AM0398 # 02 Y:2001 02 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,960 $345 Not Implemented
AM0398 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,100 $3,824 Not Implemented
AM0398 # 04 Y:2001 04 2001 USE PHOTOCELL CONTROLS $840 $0 Implemented
AM0398 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $840 $0 Not Implemented
AM0398 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $530 $200 Implemented
AM0398 # 07 Y:2001 07 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $310 $0 Implemented
AM0398 # 08 Y:2001 08 2001 PAY UTILITY BILLS ON TIME $295 $0 Implemented
AM0398 # 09 Y:2001 09 2001 WASH AND REUSE RAGS ON-SITE $170 $0 Not Implemented
AM0398 # 10 Y:2001 10 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $109 $0 Implemented
BD0186 # 01 Y:2001 01 2001 USE RADIANT HEATER FOR SPOT HEATING $4,762 $8,000 Not Implemented
BD0186 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $924 $1,118 Not Implemented
BD0186 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $828 $0 Not Implemented
BD0186 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $454 $1,000 Not Implemented