IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0059 # 09 Y:2003 09 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,518,000 $250,000 Not Implemented
SF0259 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $4,760 $300 Implemented
SF0259 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $731 $100 Implemented
SF0259 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $14,715 $5,241 Not Implemented
SF0259 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,493 $8,340 Not Implemented
SF0259 # 05 Y:2003 05 2003 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $4,415 $3,108 Not Implemented
SF0259 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,834 $23,076 Not Implemented
SF0259 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $173,236 $360,625 Implemented
SF0259 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,606 $9,060 Implemented
SF0259 # 09 Y:2003 09 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $850 $2,280 Not Implemented
SF0259 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,735 $23,266 Implemented
SF0259 # 11 Y:2003 11 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,000 $16,250 Not Implemented
SF0259 # 12 Y:2003 12 2003 OPTIMIZE PLANT POWER FACTOR $5,154 $11,258 Not Implemented
SF0259 # 13 Y:2003 13 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $82,464 $264,000 Not Implemented
UF0319 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,379 $9,534 Implemented
UF0319 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $1,277 $825 Implemented
UF0319 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $3,600 $20,000 Not Implemented
UF0319 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,151 $17,945 Not Implemented
UF0319 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,620 $0 Implemented
UF0319 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,140 $52,700 Not Implemented
UF0319 # 07 Y:2003 07 2003 MAINTAIN STEAM JETS USED FOR VACUUM SYSTEM $53,240 $38,924 Not Implemented
IA0315 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,493 $910 Implemented
IA0315 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,181 $1,942 Not Implemented
IA0315 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,631 $17,891 Implemented
IA0315 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $2,897 $6,565 Not Implemented