IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0411 # 04 Y:2008 04 2008 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,258 $461 Implemented
UF0411 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $1,200 $215 Implemented
UF0411 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $888 $364 Not Implemented
UF0411 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $62,348 $20,000 Not Implemented
UF0411 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,520 $1,000 Not Implemented
UF0411 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,144 $426 Implemented
UF0411 # 10 Y:2008 10 2008 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,946 $25,280 Not Implemented
UF0411 # 11 Y:2008 11 2008 MODIFY WORKLOAD $8,002 $0 Not Implemented
UF0411 # 12 Y:2008 12 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,419 $3,400 Not Implemented
UF0411 # 13 Y:2008 13 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $110,982 $0 Implemented
MI0165 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $94,777 $315,000 Not Implemented
MI0165 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,654 $41,800 Implemented
MI0165 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,875 $1,210 Implemented
MI0165 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,496 $40 Implemented
MI0165 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $4,023 $1,957 Implemented
MI0163 # 01 Y:2008 01 2008 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $600,000 $200,000 Implemented
MI0163 # 02 Y:2008 02 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,234 $48,055 Not Implemented
MI0163 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $4,023 $1,957 Implemented
MI0163 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,724 $11,286 Implemented
MI0163 # 05 Y:2008 05 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,968 $2,151 Implemented
UF0410 # 01 Y:2008 01 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,868 $27,216 Not Implemented
UF0410 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,023 $19,505 Not Implemented
UF0410 # 03 Y:2008 03 2008 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,665 $459 Implemented
UF0410 # 04 Y:2008 04 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,229 $233 Implemented
UF0410 # 05 Y:2008 05 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,494 $0 Implemented