IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0308 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,156 $4,132 Implemented
WV0308 # 10 Y:2005 10 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $835 $180 Not Implemented
WV0308 # 11 Y:2005 11 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $99,840 $150,768 Not Implemented
LE0207 # 01 Y:2005 01 2005 REPLACE BOILER $109,438 $9,760 Implemented
LE0207 # 02 Y:2005 02 2005 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $72,942 $500 Not Implemented
LE0207 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,328 $8,300 Implemented
LE0207 # 04 Y:2005 04 2005 INSTALL TIMERS AND/OR THERMOSTATS $5,300 $4,500 Not Implemented
LE0207 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,115 $1,000 Implemented
LE0207 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,341 $500 Implemented
LE0207 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $500 Implemented
LE0203 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $34,823 $36,750 Implemented
LE0203 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,610 $3,000 Not Implemented
LE0203 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,713 $3,840 Implemented
LE0203 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $3,600 $5,000 Not Implemented
LE0203 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,466 $3,000 Not Implemented
LE0203 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,461 $0 Not Implemented
LE0203 # 07 Y:2005 07 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,401 $500 Not Implemented
LE0203 # 08 Y:2005 08 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $864 $0 Not Implemented
SU0202 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,315 $0 Implemented
SU0202 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,691 $150 Implemented
SU0202 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,644 $500 Implemented
SU0202 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $1,315 $2,000 Not Implemented
SU0202 # 05 Y:2005 05 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $482 $1,330 Not Implemented
SU0202 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $5,577 $30,560 Implemented
SU0202 # 07 Y:2005 07 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $87,899 $535,000 Not Implemented