IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0337 # 07 Y:2013 07 2013 OPTIMIZE PLANT POWER FACTOR $6,664 $33,352 Not Implemented
WM0022 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $12,280 $30,697 Not Implemented
WM0022 # 02 Y:2013 02 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,779 $6,480 Implemented
WM0022 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $2,744 $2,303 Implemented
MZ0107 # 01 Y:2013 01 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $76,156 $80,528 Not Implemented
MZ0107 # 02 Y:2013 02 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $43,709 $1,000 Implemented
MZ0107 # 03 Y:2013 03 2013 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $12,972 $3,240 Not Implemented
MZ0107 # 04 Y:2013 04 2013 USE OPTIMUM THICKNESS INSULATION $6,130 $1,825 Implemented
MZ0107 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $4,907 $3,080 Implemented
MZ0107 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,600 $1,745 Implemented
MZ0107 # 07 Y:2013 07 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,484 $1,261 Not Implemented
MZ0107 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,356 $710 Implemented
MZ0107 # 09 Y:2013 09 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,541 $1,810 Implemented
MZ0107 # 10 Y:2013 10 2013 USE OPTIMUM THICKNESS INSULATION $1,288 $1,499 Implemented
MZ0107 # 11 Y:2013 11 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $845 $1,115 Implemented
MZ0107 # 12 Y:2013 12 2013 USE PHOTOCELL CONTROLS $265 $320 Implemented
LE0354 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,024 $8,775 Not Implemented
LE0354 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,607 $4,575 Not Implemented
LE0354 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,533 $21 Implemented
LE0354 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $459 $42 Implemented
SF0428 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,313 $0 Implemented
SF0428 # 02 Y:2013 02 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $5,121 $0 Implemented
SF0428 # 03 Y:2013 03 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $13,990 $3,780 Not Implemented
SF0428 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,736 $1,751 Implemented
SF0428 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $584 $329 Not Implemented