IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0695 # 02 Y:2004 02 2004 AUTOMATE FINISHING PROCESS $14,454 $20,000 Not Implemented
UD0695 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $7,720 $0 Implemented
UD0695 # 04 Y:2004 04 2004 USE OPTIMUM TEMPERATURE $7,076 $9 Implemented
UD0695 # 05 Y:2004 05 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,056 $0 Implemented
UD0695 # 06 Y:2004 06 2004 ADVERTISE PRODUCT OR SERVICE $7,000 $-40,240 Implemented
UD0695 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $3,434 $0 Not Implemented
UD0695 # 08 Y:2004 08 2004 USE MINIMUM SAFE OVEN VENTILATION $2,564 $0 Implemented
UD0695 # 09 Y:2004 09 2004 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,331 $175 Implemented
UD0695 # 10 Y:2004 10 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,110 $0 Implemented
UD0695 # 11 Y:2004 11 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $784 $0 Implemented
UD0695 # 12 Y:2004 12 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $729 $0 Implemented
UD0695 # 13 Y:2004 13 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $397 $756 Implemented
UD0695 # 14 Y:2004 14 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $420 $340 Not Implemented
UD0695 # 15 Y:2004 15 2004 AIR CONDITION ONLY SPACE NECESSARY $339 $0 Implemented
UD0695 # 16 Y:2004 16 2004 DISCONNECT BALLASTS $327 $7 Implemented
UD0695 # 17 Y:2004 17 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $237 $213 Implemented
UM0255 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $10,323 $6,486 Implemented
UM0255 # 02 Y:2004 02 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $6,279 $2,497 Implemented
UM0255 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,622 $9,734 Not Implemented
UM0255 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,618 $2,500 Implemented
UM0255 # 05 Y:2004 05 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,917 $8,000 Not Implemented
UM0255 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,984 $2,960 Not Implemented
AM0464 # 01 Y:2004 01 2004 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,350 $136,800 Implemented
AM0464 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,500 $500 Implemented
AM0464 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,200 $500 Implemented