IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0022 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,314 $152 Implemented
IP0022 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $631 $212 Not Implemented
IP0022 # 04 Y:2014 04 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,868 $2,394 Not Implemented
IP0022 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,308 $3,528 Implemented
IP0022 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,458 $2,226 Not Implemented
IP0022 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $870 $1,590 Implemented
IP0022 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $706 $1,711 Not Implemented
SF0443 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $169,599 $40,264 Implemented
SF0443 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,241 $840 Not Implemented
SF0443 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,931 $0 Not Implemented
SF0443 # 04 Y:2014 04 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $21,679 $25,614 Implemented
SF0443 # 05 Y:2014 05 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $57,826 $69,335 Not Implemented
SF0443 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,897 $24,840 Not Implemented
SF0443 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,886 $16,744 Not Implemented
SF0443 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $9,060 $45,537 Not Implemented
SF0443 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $63,378 $31,000 Implemented
SF0443 # 10 Y:2014 10 2014 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $11,793 $50,140 Not Implemented
SF0443 # 11 Y:2014 11 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $67,869 $444,663 Not Implemented
CO0682 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,080 $9,950 Not Implemented
CO0682 # 02 Y:2014 02 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $42,490 $93,580 Not Implemented
CO0682 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,860 $5,750 Not Implemented
CO0682 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $1,250 $1,240 Not Implemented
UD0897 # 01 Y:2014 01 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,780 $0 Not Implemented
UD0897 # 02 Y:2014 02 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $405 $0 Not Implemented
UD0897 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $755 $1,000 Implemented