Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MUCM10 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $23 | $14 | Not Implemented |
MUCM10 # 06 Y:2023 | 06 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $38 | $36 | Not Implemented |
MUCM10 # 07 Y:2023 | 07 | 2023 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,177 | $4,350 | Not Implemented |
MUCM10 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $366 | $1,749 | Not Implemented |
MUCM10 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $54 | $33 | Not Implemented |
MUCM10 # 10 Y:2023 | 10 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $332 | $648 | Not Implemented |
MUCM10 # 11 Y:2023 | 11 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,533 | $5,241 | Not Implemented |
LE0546 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,482 | $4,500 | Not Implemented |
LE0546 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $43,220 | $20,000 | Not Implemented |
LE0546 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,997 | $20,300 | Not Implemented |
LE0546 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,746 | $72,400 | Not Implemented |
LE0546 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,099 | $2,000 | Not Implemented |
LE0546 # 06 Y:2023 | 06 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,194 | $40,000 | Not Implemented |
LE0546 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $15,770 | $50,000 | Not Implemented |
LE0546 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,440 | $23,030 | Not Implemented |
LE0546 # 09 Y:2023 | 09 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,528 | $27,000 | Not Implemented |
MI0423 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $41,834 | $0 | Implemented |
MI0423 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,513 | $51,984 | Implemented |
MI0423 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,808 | $580 | Implemented |
MI0423 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,785 | $37,678 | Implemented |
MI0423 # 05 Y:2023 | 05 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,196 | $27,500 | Not Implemented |
MI0423 # 06 Y:2023 | 06 | 2023 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,580 | $1,455 | Not Implemented |
MI0423 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $4,508 | $1,250 | Implemented |
MI0423 # 08 Y:2023 | 08 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,131 | $1,500 | Implemented |
MI0423 # 09 Y:2023 | 09 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $1,771 | $900 | Not Implemented |