Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,529
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0518 # 07 Y:1994 | 07 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $120 | $210 | Implemented |
GT0518 # 08 Y:1994 | 08 | 1994 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,790 | $0 | Implemented |
GT0518 # 09 Y:1994 | 09 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,140 | $0 | Implemented |
GT0518 # 10 Y:1994 | 10 | 1994 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $8,800 | $35,000 | Not Implemented |
GT0515 # 01 Y:1993 | 01 | 1993 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,130 | $9,570 | Not Implemented |
GT0515 # 02 Y:1993 | 02 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,090 | $0 | Not Implemented |
GT0515 # 03 Y:1993 | 03 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $680 | $500 | Implemented |
GT0515 # 04 Y:1993 | 04 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,260 | $14,500 | Not Implemented |
GT0515 # 05 Y:1993 | 05 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,620 | $100,640 | Not Implemented |
GT0515 # 06 Y:1993 | 06 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $45,330 | $32,700 | Not Implemented |
GT0515 # 07 Y:1993 | 07 | 1993 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $8,650 | $6,560 | Not Implemented |
GT0515 # 08 Y:1993 | 08 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,820 | $80,090 | Implemented |
GT0516 # 01 Y:1993 | 01 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,280 | $0 | Not Implemented |
GT0516 # 02 Y:1993 | 02 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,340 | $72,000 | Not Implemented |
GT0516 # 03 Y:1993 | 03 | 1993 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $72,000 | $40,000 | Not Implemented |
GT0516 # 04 Y:1993 | 04 | 1993 | USE SYNTHETIC LUBRICANT | $39,000 | $0 | Not Implemented |
GT0513 # 01 Y:1993 | 01 | 1993 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,070 | $57,930 | n/a |
GT0513 # 02 Y:1993 | 02 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $100 | $460 | n/a |
GT0513 # 03 Y:1993 | 03 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $40 | $0 | n/a |
GT0513 # 04 Y:1993 | 04 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $430 | $0 | n/a |
GT0513 # 05 Y:1993 | 05 | 1993 | KEEP EQUIPMENT CLEAN | $270 | $25 | n/a |
GT0513 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,910 | $7,770 | n/a |
GT0513 # 07 Y:1993 | 07 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $200 | $100 | n/a |
GT0513 # 08 Y:1993 | 08 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $80 | $180 | n/a |
GT0512 # 01 Y:1993 | 01 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,800 | $61,520 | Implemented |