IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0273 # 06 Y:1997 06 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,873 $1,155 Not Implemented
ND0273 # 07 Y:1997 07 1997 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $116,808 $15,230 Implemented
ND0273 # 08 Y:1997 08 1997 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $51,750 $3,780 Implemented
ND0273 # 09 Y:1997 09 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $82 $395 Implemented
ND0273 # 10 Y:1997 10 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $82 $350 Not Implemented
ND0273 # 11 Y:1997 11 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,719 $5,060 Implemented
ND0273 # 12 Y:1997 12 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $126 $0 Not Implemented
ND0274 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,097 $1,655 Implemented
ND0274 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $10,153 $15,462 Implemented
ND0274 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,526 $240 Implemented
ND0274 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,078 $1,500 Implemented
ND0274 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $650 Implemented
ND0274 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $144 Implemented
ND0274 # 07 Y:1997 07 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $172 $449 Implemented
ND0276 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,118 $600 n/a
ND0276 # 02 Y:1997 02 1997 RECOVER WASTE HEAT FROM EQUIPMENT $16,897 $10,000 n/a
ND0276 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $670 $1,053 n/a
ND0276 # 04 Y:1997 04 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $5 $17 n/a
ND0276 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $158 $450 n/a
ND0276 # 06 Y:1997 06 1997 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $9,928 $150 n/a
ND0276 # 07 Y:1997 07 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,531 $240 n/a
ND0276 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,377 $340 n/a
ND0276 # 09 Y:1997 09 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,090 $2,400 n/a
ND0269 # 01 Y:1997 01 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $144,546 $20,000 Implemented
ND0269 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $61,578 $49,200 Not Implemented