IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0025 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $20,807 $284 Implemented
KG0025 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,160 $6,450 Implemented
KG0025 # 05 Y:1995 05 1995 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,950 $60 Not Implemented
KG0025 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,632 $20 Implemented
KG0025 # 07 Y:1995 07 1995 INSTALL OCCUPANCY SENSORS $451 $325 Implemented
UD0461 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,758 $45,000 Implemented
UD0461 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,437 $0 Implemented
UD0461 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,923 $0 Implemented
UD0461 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,525 $14,640 Implemented
UD0461 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,483 $1,000 Implemented
UD0461 # 06 Y:1995 06 1995 USE EVAPORATION TO CONCENTRATE MATERIAL $14,223 $20,000 Implemented
UL0127 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,455 $40 Implemented
UL0127 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,913 $2,000 Implemented
UL0127 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $37,934 $59,260 Not Implemented
UM0027 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,047 $760 Implemented
UM0027 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,609 $14,020 Implemented
UM0027 # 03 Y:1995 03 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,197 $3,100 Implemented
UM0027 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,636 $1,998 Not Implemented
TN0563 # 01 Y:1995 01 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $8,547 $16,638 Implemented
TN0563 # 02 Y:1995 02 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $816 $134 Implemented
TN0563 # 03 Y:1995 03 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $3,191 $0 Implemented
TN0563 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $643 $245 Not Implemented
TN0563 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,115 $701 Implemented
TN0563 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,625 $1,540 Implemented
TN0563 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $303 $170 Implemented