IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0702 # 01 Y:2015 01 2015 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,850 $20,000 n/a
CO0702 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,630 $950 n/a
CO0702 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,680 $42,100 n/a
CO0702 # 04 Y:2015 04 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,480 $500 n/a
CO0701 # 01 Y:2015 01 2015 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $32,810 $82,650 Not Implemented
CO0701 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $19,610 $20,000 Implemented
CO0701 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,920 $3,750 Implemented
CO0701 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $2,460 Implemented
CO0700 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $1,270 Implemented
CO0700 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $4,710 $0 Not Implemented
CO0700 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,950 $82,280 Not Implemented
CO0700 # 04 Y:2015 04 2015 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $4,840 $15,500 Not Implemented
CO0700 # 05 Y:2015 05 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $540 $1,820 Not Implemented
CO0699 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,690 $290 Implemented
CO0699 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,720 $13,660 Not Implemented
CO0699 # 03 Y:2015 03 2015 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,040 $13,500 Not Implemented
CO0699 # 04 Y:2015 04 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,890 $500 Implemented
CO0698 # 01 Y:2014 01 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,950 $300 Not Implemented
CO0698 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $500 Implemented
CO0698 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,800 $16,900 Implemented
CO0698 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,000 $1,500 Not Implemented
CO0697 # 01 Y:2014 01 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,320 $29,550 Not Implemented
CO0697 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,760 $1,550 Not Implemented
CO0697 # 03 Y:2014 03 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $13,090 $87,610 Not Implemented
CO0697 # 04 Y:2014 04 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $8,560 $38,890 Not Implemented