IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0253 # 02 Y:2022 02 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $43,447 $8,510 Not Implemented
IC0253 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50 $0 Not Implemented
IC0253 # 04 Y:2022 04 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $39,245 $13,624 Not Implemented
IC0253 # 05 Y:2022 05 2022 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $21,572 $7,624 Not Implemented
IC0250 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,107 $4,150 Implemented
IC0250 # 02 Y:2021 02 2021 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $10,348 $10,376 Not Implemented
IC0250 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,708 $10,610 Implemented
IC0250 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,063 $5,652 Not Implemented
IC0250 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $473 $0 Implemented
IC0250 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $688 $762 Implemented
IC0247 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,735 $1,539 Implemented
IC0247 # 02 Y:2021 02 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,646 $64,258 Implemented
IC0247 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,752 $1,964 Not Implemented
IC0247 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,040 $5,000 Implemented
IC0247 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,246 $207 Not Implemented
IC0247 # 06 Y:2021 06 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $283 $578 Not Implemented
IC0247 # 07 Y:2021 07 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,269 $24,850 Not Implemented
IP0148 # 01 Y:2021 01 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $104 $0 Not Implemented
IP0148 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $844 $0 Implemented
IP0148 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,097 $185 Implemented
IP0148 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $126 $504 Not Implemented
IP0148 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $125 $522 Implemented
TT0252 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,977 $21,240 Not Implemented
TT0252 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $12,310 $29,594 Not Implemented
TT0252 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,938 $40 Implemented