IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0800 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,117 $14,400 Not Implemented
MA0800 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,064 $15,819 Not Implemented
MA0800 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $893 $500 Implemented
MA0800 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $500 Implemented
MA0799 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,506 $138,640 Not Implemented
MA0799 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,826 $47,870 Not Implemented
MA0799 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,442 $14,461 Implemented
MA0799 # 04 Y:2019 04 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,709 $2,500 Implemented
MA0799 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,784 $4,000 Implemented
MA0799 # 06 Y:2019 06 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,202 $5,200 Not Implemented
MA0798 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,625 $48,500 Implemented
MA0798 # 02 Y:2019 02 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,484 $80,000 Implemented
MA0798 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $7,569 $8,930 Not Implemented
MA0798 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,904 $2,765 Not Implemented
MA0798 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $3,333 $1,801 Implemented
MA0798 # 06 Y:2019 06 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,585 $500 Not Implemented
MA0798 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,849 $2,001 Implemented
MA0798 # 08 Y:2019 08 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $922 $978 Not Implemented
MA0798 # 09 Y:2019 09 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $512 $200 Implemented
MA0797 # 01 Y:2019 01 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,419 $18,225 Not Implemented
MA0797 # 02 Y:2019 02 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,247 $16,050 Not Implemented
MA0797 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,353 $500 Not Implemented
MA0797 # 04 Y:2019 04 2019 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,739 $3,000 Implemented
MA0797 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $845 $500 Not Implemented
MA0795 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $100,737 $184,800 Not Implemented