IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,443

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0032 # 02 Y:2019 02 2019 USE ULTRASONIC CLEANING $13,380 $15,575 Implemented
NL0032 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $126 $500 Implemented
NL0031 # 01 Y:2019 01 2019 USE OPTIMUM TEMPERATURE $1,023,132 $178,000 Implemented
NL0031 # 02 Y:2019 02 2019 INSTALL TURBULATORS $66,132 $93,000 Implemented
NL0031 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,344 $46,600 Implemented
NL0031 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,390 $24,394 Implemented
NL0031 # 05 Y:2019 05 2019 REPAIR AND ELIMINATE STEAM LEAKS $5,225 $1,600 Not Implemented
NL0029 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,632 $18,300 Implemented
NL0029 # 02 Y:2019 02 2019 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $11,970 $4,500 Not Implemented
NL0029 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $1,500 Implemented
NL0028 # 01 Y:2019 01 2019 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $23,879 $45,000 Not Implemented
NL0028 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,950 $52,450 Implemented
NL0028 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $3,028 $4,631 Implemented
NL0028 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,582 $1,600 Implemented
NL0028 # 05 Y:2019 05 2019 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $132 $474 Not Implemented
NL0027 # 01 Y:2018 01 2018 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,797 $32,620 Implemented
NL0027 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,840 $74,980 Implemented
NL0027 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $4,500 $2,500 Not Implemented
NL0027 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $607 $1,050 Not Implemented
NL0027 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $326 $1,000 Implemented
NL0026 # 01 Y:2018 01 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,240 $65,000 Not Implemented
NL0026 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,570 $69,390 Implemented
NL0026 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $1,000 Implemented
NL0026 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 Not Implemented
NL0025 # 01 Y:2018 01 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,194 $15,000 Not Implemented