IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1046 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $2,125 $8,240 Not Implemented
OK1046 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,027 $38,688 Implemented
OK1044 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,137 $0 Not Implemented
OK1044 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,516 $3,266 Not Implemented
OK1044 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,702 $14,800 Implemented
OK1044 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $3,229 $11,200 Not Implemented
OK1042 # 01 Y:2021 01 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,084 $813 Not Implemented
OK1042 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,703 $0 Implemented
OK1042 # 03 Y:2021 03 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $178 $308 Not Implemented
OK1042 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $303 $1,200 Not Implemented
OK1039 # 01 Y:2021 01 2021 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $361 $570 Implemented
OK1039 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $3,438 Implemented
OK1039 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $421 $488 Implemented
OK1039 # 04 Y:2021 04 2021 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,960 $4,835 Not Implemented
OK1040 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $83,427 $407,400 Not Implemented
OK1040 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,167 $70,338 Not Implemented
OK1040 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,923 $2,911 Implemented
OK1040 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,152 $4,457 Implemented
OK1038 # 01 Y:2021 01 2021 INSTALL OCCUPANCY SENSORS $563 $1,944 Not Implemented
OK1038 # 02 Y:2021 02 2021 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $24,443 $2,171 Not Implemented
OK1038 # 03 Y:2021 03 2021 INSTALL TIMERS AND/OR THERMOSTATS $991 $0 Not Implemented
OK1037 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,395 $2,804 Implemented
OK1037 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,825 $0 Not Implemented
OK1037 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $587 $955 Not Implemented
OK1037 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,155 $4,128 Implemented