IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0485 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,410 $17,950 Not Implemented
OR0728 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,023 $34,574 Not Implemented
OR0728 # 02 Y:2019 02 2019 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $29,427 $34,054 Not Implemented
OR0728 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,174 $4,152 Not Implemented
OR0728 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,008 $0 Implemented
SU0491 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $1,603 $0 Not Implemented
SU0491 # 02 Y:2019 02 2019 ELIMINATE/REDUCE AN OPERATION $4,160 $940 Not Implemented
SU0491 # 03 Y:2019 03 2019 REDUCE VENTILATION AIR $1,938 $934 Not Implemented
SU0491 # 04 Y:2019 04 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $405 $542 Not Implemented
SU0491 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,086 $1,842 Not Implemented
SU0491 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,429 $102,442 Not Implemented
SU0491 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $385 $1,387 Not Implemented
WM0146 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $14,090 $69,698 Not Implemented
WM0146 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,792 $16,000 Not Implemented
WM0146 # 03 Y:2019 03 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,022 $6,480 Not Implemented
WM0146 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,546 $16,462 Not Implemented
WM0146 # 05 Y:2019 05 2019 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $936 $1,950 Not Implemented
WM0146 # 06 Y:2019 06 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $520 $618 Not Implemented
UD1006 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $44,647 $16,500 Implemented
UD1006 # 02 Y:2019 02 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $125,929 $30,000 Not Implemented
UD1006 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $27,201 $54,202 Not Implemented
UD1006 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $50,796 $0 Not Implemented
UD1006 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $8,839 $3,770 Not Implemented
UD1006 # 06 Y:2019 06 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,275 $16,696 Not Implemented
WM0145 # 01 Y:2019 01 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $29,234 $3,500 Not Implemented