IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0165 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,603 $1,850 Implemented
CO0165 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,040 $3,000 Implemented
CO0165 # 06 Y:1989 06 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $610 $1,000 Not Implemented
CO0165 # 07 Y:1989 07 1989 INSULATE BARE EQUIPMENT $950 $200 Not Implemented
CO0165 # 08 Y:1989 08 1989 REDUCE VENTILATION AIR $710 $450 Implemented
CO0165 # 09 Y:1989 09 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $418 $300 Implemented
CO0166 # 01 Y:1989 01 1989 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,860 $250 Implemented
CO0166 # 02 Y:1989 02 1989 OPTIMIZE PLANT POWER FACTOR $3,760 $3,900 Implemented
CO0166 # 03 Y:1989 03 1989 INSTALL AUTOMATIC STACK DAMPER $2,050 $4,000 Implemented
CO0166 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $4,130 Not Implemented
CO0166 # 05 Y:1989 05 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $800 $600 Implemented
CO0166 # 06 Y:1989 06 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $440 $200 Not Implemented
CO0166 # 07 Y:1989 07 1989 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $430 $100 Implemented
CO0167 # 01 Y:1989 01 1989 OPTIMIZE PLANT POWER FACTOR $6,740 $6,800 Implemented
CO0167 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,010 $150 Implemented
CO0167 # 03 Y:1989 03 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,800 $2,500 Not Implemented
CO0167 # 04 Y:1989 04 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,345 $1,000 Not Implemented
CO0167 # 05 Y:1989 05 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,200 $1,900 Not Implemented
CO0167 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $455 $335 Implemented
CO0167 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $105 $315 Implemented
CO0167 # 08 Y:1989 08 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $870 $200 Implemented
CO0167 # 09 Y:1989 09 1989 INSULATE BARE EQUIPMENT $360 $290 Implemented
CO0168 # 01 Y:1989 01 1989 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,360 $250 Implemented
CO0168 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,015 $4,600 Not Implemented
CO0168 # 03 Y:1989 03 1989 COVER OPEN TANKS $1,600 $400 Implemented