Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0009 # 06 Y:1987 | 06 | 1987 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $6,380 | $2,300 | Not Implemented |
OR0009 # 07 Y:1987 | 07 | 1987 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,914 | $3,380 | Not Implemented |
OR0009 # 08 Y:1987 | 08 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $208 | $243 | Not Implemented |
OR0009 # 09 Y:1987 | 09 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,465 | $3,040 | Not Implemented |
OR0009 # 10 Y:1987 | 10 | 1987 | REDUCE FLUID FLOW RATES | $31,011 | $7,283 | Implemented |
OR0009 # 11 Y:1987 | 11 | 1987 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $434,000 | $960,000 | Not Implemented |
OR0010 # 01 Y:1987 | 01 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $33,410 | $300 | Implemented |
OR0010 # 02 Y:1987 | 02 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,812 | $0 | Not Implemented |
OR0010 # 03 Y:1987 | 03 | 1987 | INCREASE AMOUNT OF CONDENSATE RETURNED | $31,778 | $2,900 | Implemented |
OR0010 # 04 Y:1987 | 04 | 1987 | OPTIMIZE PLANT POWER FACTOR | $28,881 | $11,000 | Implemented |
OR0010 # 05 Y:1987 | 05 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $269 | $261 | Implemented |
OR0010 # 06 Y:1987 | 06 | 1987 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,307 | $36,869 | Implemented |
OR0010 # 07 Y:1987 | 07 | 1987 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $302,160 | $3,750,000 | Implemented |
OR0011 # 01 Y:1987 | 01 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $922 | $0 | Implemented |
OR0011 # 02 Y:1987 | 02 | 1987 | INSULATE BARE EQUIPMENT | $389 | $96 | Implemented |
OR0011 # 03 Y:1987 | 03 | 1987 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,474 | $0 | Not Implemented |
OR0011 # 04 Y:1987 | 04 | 1987 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,519 | $1,536 | Implemented |
OR0011 # 05 Y:1987 | 05 | 1987 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,969 | $3,600 | Not Implemented |
OR0011 # 06 Y:1987 | 06 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $4,103 | $3,000 | Not Implemented |
OR0011 # 07 Y:1987 | 07 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,024 | $1,092 | Implemented |
OR0011 # 08 Y:1987 | 08 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $777 | $746 | Implemented |
OR0006 # 01 Y:1987 | 01 | 1987 | INSTALL SET-BACK TIMERS | $451 | $0 | Not Implemented |
OR0006 # 02 Y:1987 | 02 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,009 | $8,000 | Implemented |
OR0006 # 03 Y:1987 | 03 | 1987 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $8,718 | $1,000 | Implemented |
OR0006 # 04 Y:1987 | 04 | 1987 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $25,130 | $7,000 | Not Implemented |