IAC Assessment: OR0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product PUREE CONCENTRATES
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 14,000,000 Pounds
Production Hrs. Annual 0
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,769 2,016,706 kWh $0.06
Natural Gas $217,147 53,845 MMBtu $4.03
TOTAL ENERGY COSTS $331,916
RECOMMENDED SAVINGS* $15,057 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,311
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$326
Cost:
-
- - $326 81 - - -
-
kWh
$326
81
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$818
Cost:
-
$818 14,361 - - - - $818
14,361
kWh
-
-
MMBtu
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$2,710
Cost:
-
$2,710 47,479 - - - - $2,710
47,479
kWh
-
-
MMBtu
-
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$6,291
Cost:
-
$6,291 110,492 - - - - $6,291
110,492
kWh
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,466
Cost:
$300
- - $3,466 860 - - -
-
kWh
$3,466
860
MMBtu
-
-
$
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$150
Cost:
$76
- - $150 37 - - -
-
kWh
$150
37
MMBtu
-
-
$
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$502
Cost:
$320
- - - - $502 - -
-
kWh
-
-
MMBtu
$502
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$276
Cost:
$298
$276 4,982 - - - - $276
4,982
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$518
Cost:
$997
$582 10,258 - - $(-64) - $582
10,258
kWh
-
-
MMBtu
$(-64)
-
$
TOTAL RECOMMENDED Savings:
$15,057
Cost:
$1,991
$10,677 187,572 $3,942 978 $438 - $10,677
187,572
kWh
$3,942
978
MMBtu
$438
-
$
TOTAL IMPLEMENTED Savings:
$13,311
Cost:
$1,297
$9,583 168,229 $3,792 941 $(-64) - $9,583
168,229
kWh
$3,792
941
MMBtu
$(-64)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes