IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0541 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $13 Not Implemented
AM0541 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $275 Implemented
AM0541 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $395 $840 Implemented
AM0541 # 06 Y:2008 06 2008 USE SYNTHETIC LUBRICANT $163 $0 Implemented
AM0542 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,800 $1,680 Implemented
AM0542 # 02 Y:2008 02 2008 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,100 $0 Implemented
AM0542 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $12,000 $18,000 Not Implemented
AM0542 # 04 Y:2008 04 2008 PAY BILLS ON TIME TO AVOID LATE FEES $6,925 $0 Not Implemented
AM0542 # 05 Y:2008 05 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,500 $0 Implemented
LL0290 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,461 $8,520 Implemented
LL0290 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $11,156 $3,650 Not Implemented
LL0290 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $8,437 $3,364 Not Implemented
LL0290 # 04 Y:2008 04 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,191 $615 Not Implemented
LL0290 # 05 Y:2008 05 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $648 $775 Not Implemented
LL0290 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $293 $175 Not Implemented
LL0290 # 07 Y:2008 07 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $77 $483 Not Implemented
AM0540 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $700,000 $117,000 Implemented
AM0540 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $97,610 $1,000 Implemented
AM0540 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $12,800 $3,000 Implemented
AM0540 # 04 Y:2008 04 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $15,410 $5,000 Implemented
AM0540 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $12,850 $2,000 Implemented
AM0540 # 06 Y:2008 06 2008 USE SYNTHETIC LUBRICANT $5,820 $0 Implemented
AM0540 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $980 $715 Implemented
AM0539 # 01 Y:2008 01 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $163,000 $105,000 Not Implemented
AM0539 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,400 $52,400 Not Implemented