IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0107 # 01 Y:2001 01 2001 IMPROVE LUBRICATION PRACTICES $272 $200 Implemented
LE0107 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $639 $0 Implemented
LE0107 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $304 $0 Implemented
LE0107 # 04 Y:2001 04 2001 INSTALL SET-BACK TIMERS $7,324 $2,100 Not Implemented
LE0107 # 05 Y:2001 05 2001 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $853 $500 Not Implemented
LE0107 # 06 Y:2001 06 2001 USE OPTIMUM THICKNESS INSULATION $246 $350 Implemented
LE0107 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,622 $2,820 Not Implemented
SD0274 # 01 Y:2001 01 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $126,144 $15,000 n/a
SD0274 # 02 Y:2001 02 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $37,083 $40,000 n/a
SD0274 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $48,575 $10,000 Not Implemented
SD0274 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $440 Implemented
SD0274 # 05 Y:2001 05 2001 USE POWER DURING OFF-PEAK PERIODS $36,091 $0 Implemented
SD0274 # 06 Y:2001 06 2001 INSTALL SKYLIGHTS $18,319 $50,000 Implemented
SD0274 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $1,712 $1,000 Implemented
SD0274 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,260 $8,000 Not Implemented
SD0274 # 09 Y:2001 09 2001 USE OPTIMUM TEMPERATURE $4,364 $0 Implemented
SD0274 # 10 Y:2001 10 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,682 $2,300 Not Implemented
SD0274 # 11 Y:2001 11 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $83,208 $2,000 Not Implemented
CO0482 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,100 $210 Implemented
CO0482 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $990 $370 Implemented
CO0482 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $900 $1,500 Not Implemented
CO0482 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $60 Implemented
CO0482 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Not Implemented
CO0482 # 08 Y:2001 08 2001 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $16,420 $730 Not Implemented
CO0482 # 09 Y:2001 09 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $730 $2,000 Not Implemented