Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2001 |
Principal Product | gears |
NAICS | n/a |
SIC | 3462 - Iron And Steel Forgings |
Sales | $1,000,000-$5,000,000 |
# of Employees | 17 |
Plant Area (Sq.Ft.) | 28,800 |
Annual Production | 50,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $27,775 | 911,800 | kWh | $0.03 |
Electricity Demand | $18,161 | 1,936 | kW-months/year | $9.38 |
Electricity Fees | $120 | - | $ | - |
Natural Gas | $13,697 | 2,428 | MMBtu | $5.64 |
TOTAL ENERGY COSTS | $81,861 | |||
RECOMMENDED SAVINGS* | $91,670 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,400 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $5,120 Cost: $10,000 |
- | - | - | - | $5,120 | 713 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,120 713 MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,800 Cost: $700 |
- | - | - | - | $1,800 | 250 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,800 250 MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,100 Cost: $210 |
$790 | 26,000 | $670 | 71 | - | - | - | - | - | - | - | - | $(-360) | - | - | - | - | - | - | - |
$790 26,000 kWh |
$670 71 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
$(-360) - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $990 Cost: $370 |
$160 | 5,200 | - | - | $830 | 116 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$160 5,200 kWh |
- - kW-months/year |
$830 116 MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $900 Cost: $1,500 |
- | - | $900 | 96 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$900 96 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $310 Cost: $60 |
$170 | 5,500 | $140 | 15 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$170 5,500 kWh |
$140 15 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $190 Cost: - |
$160 | 5,300 | $110 | 12 | - | - | - | - | - | - | - | - | - | - | - | - | $(-80) | - | - | - |
$160 5,300 kWh |
$110 12 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
$(-80) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.7112 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING |
Savings: $16,420 Cost: $730 |
- | - | - | - | - | - | - | - | $(-1,440) | (-354) | $14,960 | 4,725 | $(-860) | - | - | - | $3,760 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$(-1,440) (-354) gal |
$14,960 4,725 lb |
$(-860) - $ |
- - $ |
$3,760 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $730 Cost: $2,000 |
$(-80) | 2,600 | $(-40) | (-4) | - | - | - | - | $1,490 | 156 | - | - | - | - | - | - | $(-640) | - | - | - |
$(-80) 2,600 kWh |
$(-40) (-4) kW-months/year |
- - MMBtu |
- - MMBtu |
$1,490 156 gal |
- - lb |
- - $ |
- - $ |
$(-640) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY |
Savings: $64,110 Cost: $75,000 |
- | - | - | - | - | - | $(-12,320) | (-1,150) | - | - | - | - | - | - | $20,430 | - | - | - | $56,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$(-12,320) (-1,150) MMBtu |
- - gal |
- - lb |
- - $ |
$20,430 - $ |
- - $ |
$56,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $91,670 Cost: $90,570 |
$1,200 | 44,600 | $1,780 | 190 | $7,750 | 1,079 | $(-12,320) | (-1,150) | $50 | (-198) | $14,960 | 4,725 | $(-1,220) | - | $20,430 | - | $3,040 | - | $56,000 | - | $1,200 44,600 kWh |
$1,780 190 kW-months/year |
$7,750 1,079 MMBtu |
$(-12,320) (-1,150) MMBtu |
$50 (-198) gal |
$14,960 4,725 lb |
$(-1,220) - $ |
$20,430 - $ |
$3,040 - $ |
$56,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,400 Cost: $640 |
$1,120 | 36,700 | $810 | 86 | $830 | 116 | - | - | - | - | - | - | $(-360) | - | - | - | - | - | - | - | $1,120 36,700 kWh |
$810 86 kW-months/year |
$830 116 MMBtu |
- - MMBtu |
- - gal |
- - lb |
$(-360) - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Primary Product |