IAC Assessment: CO0482
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0482
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2001
Principal Product gears
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $1,000,000-$5,000,000
# of Employees 17
Plant Area (Sq.Ft.) 28,800
Annual Production 50,000 Pieces
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,775 911,800 kWh $0.03
Electricity Demand $18,161 1,936 kW-months/year $9.38
Electricity Fees $120 - $ -
Natural Gas $13,697 2,428 MMBtu $5.64
TOTAL ENERGY COSTS $81,861
RECOMMENDED SAVINGS* $91,670 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,400
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Other Liquid (haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Other Liquid (haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ gal $ lb $ $ $ $ $ $ $ $
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$5,120
Cost:
$10,000
- - - - $5,120 713 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,120
713
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,800
Cost:
$700
- - - - $1,800 250 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,800
250
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,100
Cost:
$210
$790 26,000 $670 71 - - - - - - - - $(-360) - - - - - - - $790
26,000
kWh
$670
71
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
$(-360)
-
$
-
-
$
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$990
Cost:
$370
$160 5,200 - - $830 116 - - - - - - - - - - - - - - $160
5,200
kWh
-
-
kW-months/year
$830
116
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$900
Cost:
$1,500
- - $900 96 - - - - - - - - - - - - - - - - -
-
kWh
$900
96
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$310
Cost:
$60
$170 5,500 $140 15 - - - - - - - - - - - - - - - - $170
5,500
kWh
$140
15
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$190
Cost:
-
$160 5,300 $110 12 - - - - - - - - - - - - $(-80) - - - $160
5,300
kWh
$110
12
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
$(-80)
-
$
-
-
$
08: 3.7112 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING Savings:
$16,420
Cost:
$730
- - - - - - - - $(-1,440) (-354) $14,960 4,725 $(-860) - - - $3,760 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-1,440)
(-354)
gal
$14,960
4,725
lb
$(-860)
-
$
-
-
$
$3,760
-
$
-
-
$
09: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$730
Cost:
$2,000
$(-80) 2,600 $(-40) (-4) - - - - $1,490 156 - - - - - - $(-640) - - - $(-80)
2,600
kWh
$(-40)
(-4)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,490
156
gal
-
-
lb
-
-
$
-
-
$
$(-640)
-
$
-
-
$
10: 4.6310 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$64,110
Cost:
$75,000
- - - - - - $(-12,320) (-1,150) - - - - - - $20,430 - - - $56,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-12,320)
(-1,150)
MMBtu
-
-
gal
-
-
lb
-
-
$
$20,430
-
$
-
-
$
$56,000
-
$
TOTAL RECOMMENDED Savings:
$91,670
Cost:
$90,570
$1,200 44,600 $1,780 190 $7,750 1,079 $(-12,320) (-1,150) $50 (-198) $14,960 4,725 $(-1,220) - $20,430 - $3,040 - $56,000 - $1,200
44,600
kWh
$1,780
190
kW-months/year
$7,750
1,079
MMBtu
$(-12,320)
(-1,150)
MMBtu
$50
(-198)
gal
$14,960
4,725
lb
$(-1,220)
-
$
$20,430
-
$
$3,040
-
$
$56,000
-
$
TOTAL IMPLEMENTED Savings:
$2,400
Cost:
$640
$1,120 36,700 $810 86 $830 116 - - - - - - $(-360) - - - - - - - $1,120
36,700
kWh
$810
86
kW-months/year
$830
116
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
$(-360)
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ gal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Other Liquid (haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Other Liquid (haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product