IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0021 # 04 Y:2014 04 2014 PAY BILLS ON TIME TO AVOID LATE FEES $1,181 $0 Implemented
IP0021 # 05 Y:2014 05 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,336 $0 Not Implemented
IP0021 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $222 $118 Implemented
IP0021 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $349 $231 Not Implemented
IP0021 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,868 $5,580 Implemented
UA0113 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,063 $93,733 Not Implemented
UA0113 # 02 Y:2014 02 2014 INSTALL SKYLIGHTS $31,556 $40,622 Not Implemented
UA0113 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,580 $1,900 Implemented
UA0113 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,732 $800 Not Implemented
UA0113 # 05 Y:2014 05 2014 USE RADIANT HEATER FOR SPOT HEATING $10,526 $11,550 Not Implemented
UA0113 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,556 $321 Implemented
SD0478 # 01 Y:2014 01 2014 REDUCE SCRAP PRODUCTION $30,811 $12,465 Implemented
SD0478 # 02 Y:2014 02 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,342 $32,990 Not Implemented
SD0478 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,128 $500 Implemented
SD0478 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $2,630 $2,535 Implemented
SD0478 # 05 Y:2014 05 2014 USE PHOTOCELL CONTROLS $2,220 $4,625 Implemented
SF0442 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,021 $0 Implemented
SF0442 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,864 $2,722 Implemented
SF0442 # 03 Y:2014 03 2014 ADD AREA LIGHTING SWITCHES $409 $252 Not Implemented
SF0442 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,082 $12,459 Implemented
SF0442 # 05 Y:2014 05 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $231 $1,559 Implemented
SF0442 # 06 Y:2014 06 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $14,162 $173,094 Not Implemented
CO0681 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,480 $13,140 Not Implemented
CO0681 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $3,470 $900 Not Implemented
CO0681 # 03 Y:2014 03 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $175,400 $229,810 Implemented