IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0143 # 01 Y:2002 01 2002 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $29,798 $32,697 Implemented
SU0143 # 02 Y:2002 02 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $4,584 $10,455 Implemented
SU0143 # 03 Y:2002 03 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,371 $3,000 Implemented
SU0143 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,432 $300 Not Implemented
SU0143 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,656 $420 Implemented
SU0143 # 06 Y:2002 06 2002 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $42,656 $128,836 Not Implemented
SU0142 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $301,334 $2,109,900 Not Implemented
SU0142 # 02 Y:2002 02 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $42,602 $19,900 Implemented
SU0142 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $9,118 $3,100 Not Implemented
SU0142 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,958 $230 Implemented
SU0142 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,062 $0 Not Implemented
SU0142 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,095 $0 Not Implemented
SU0142 # 07 Y:2002 07 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $700 Not Implemented
SU0140 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $593,735 $5,128,500 Not Implemented
SU0140 # 02 Y:2002 02 2002 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $392,475 $730,000 Not Implemented
SU0140 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $147,968 $19,500 Not Implemented
SU0140 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,283 $64,018 Implemented
SU0140 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,631 $14,250 Implemented
SU0140 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,122 $700 Implemented
SU0140 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,142 $360 Not Implemented
SU0140 # 08 Y:2002 08 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $3,151 $8,733 Implemented
SU0140 # 09 Y:2002 09 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,480 $0 Implemented
SU0140 # 10 Y:2002 10 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $931 $581 Not Implemented
SU0139 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $602,817 $2,180,000 Not Implemented
SU0139 # 02 Y:2002 02 2002 RECOVER AND REUSE WASTE MATERIAL $22,050 $8,000 Not Implemented