IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0359 # 03 Y:1989 03 1989 CLOSE OFF UNNEEDED STEAM LINES $567 $0 Not Implemented
TN0359 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,093 $2,150 Implemented
TN0359 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $-88 $0 Not Implemented
TN0359 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $144 Implemented
TN0359 # 07 Y:1989 07 1989 INSULATE BARE EQUIPMENT $147 $261 Not Implemented
TN0359 # 08 Y:1989 08 1989 IMPROVE LUBRICATION PRACTICES $759 $1,800 Not Implemented
TN0359 # 09 Y:1989 09 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $143 $289 Not Implemented
TN0359 # 10 Y:1989 10 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $73 $40 Not Implemented
TN0367 # 01 Y:1989 01 1989 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $112,287 $240,400 Not Implemented
TN0367 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,151 $47,160 Not Implemented
TN0367 # 03 Y:1989 03 1989 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $24,700 $39,800 Not Implemented
TN0367 # 04 Y:1989 04 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,986 $14,400 Implemented
TN0367 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,618 $510 Implemented
TN0367 # 06 Y:1989 06 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,876 $20,900 Implemented
TN0367 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,338 $0 Implemented
TN0367 # 08 Y:1989 08 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,336 $500 Implemented
TN0367 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $631 $0 Implemented
TN0367 # 10 Y:1989 10 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,898 $490 Implemented
TN0368 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,877 $0 Not Implemented
TN0368 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $4,310 $2,994 Not Implemented
TN0368 # 03 Y:1989 03 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,212 $7,800 Not Implemented
TN0368 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,470 $1,190 Not Implemented
TN0368 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,946 $1,470 Not Implemented
TN0368 # 06 Y:1989 06 1989 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $6,287 $25,000 Not Implemented
TN0368 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,013 $0 Not Implemented