IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0361 # 01 Y:1989 01 1989 ADJUST VENTS TO MINIMIZE ENERGY USE $30,604 $6,500 Not Implemented
TN0361 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,381 $1,110 Implemented
TN0361 # 03 Y:1989 03 1989 USE RADIANT HEATER FOR SPOT HEATING $2,488 $5,550 Implemented
TN0361 # 04 Y:1989 04 1989 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $1,833 $3,650 Not Implemented
TN0361 # 05 Y:1989 05 1989 INSTALL SET-BACK TIMERS $7,384 $0 Not Implemented
TN0361 # 06 Y:1989 06 1989 INSULATE BARE EQUIPMENT $2,222 $548 Not Implemented
TN0361 # 07 Y:1989 07 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,339 $680 Implemented
TN0361 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,021 $0 Implemented
TN0361 # 09 Y:1989 09 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $188 $1,750 Not Implemented
TN0361 # 10 Y:1989 10 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,587 $780 Implemented
TN0361 # 11 Y:1989 11 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $82 $50 Implemented
TN0361 # 12 Y:1989 12 1989 INSULATE BARE EQUIPMENT $334 $247 Not Implemented
TN0361 # 13 Y:1989 13 1989 OPTIMIZE PLANT POWER FACTOR $37,840 $35,000 Implemented
TN0357 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,000 $900 Implemented
TN0357 # 02 Y:1989 02 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $7,743 $4,388 Not Implemented
TN0357 # 03 Y:1989 03 1989 RECOVER WASTE HEAT FROM EQUIPMENT $4,409 $1,380 Implemented
TN0357 # 04 Y:1989 04 1989 INSULATE BARE EQUIPMENT $3,004 $355 Implemented
TN0357 # 05 Y:1989 05 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $928 $1,110 Implemented
TN0357 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,541 $0 Implemented
TN0357 # 07 Y:1989 07 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,315 $560 Implemented
TN0357 # 08 Y:1989 08 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $673 $180 Not Implemented
TN0357 # 09 Y:1989 09 1989 DISCONNECT BALLASTS $254 $273 Implemented
TN0357 # 10 Y:1989 10 1989 OPTIMIZE PLANT POWER FACTOR $4,607 $6,600 Implemented
TN0354 # 01 Y:1988 01 1988 USE RADIANT HEATER FOR SPOT HEATING $61,495 $24,325 Implemented
TN0354 # 02 Y:1988 02 1988 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $19,453 $41,240 Not Implemented