Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,197
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0200 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,456 | $0 | Not Implemented |
IP0200 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,451 | $75 | Implemented |
IP0200 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,593 | $0 | Implemented |
IP0200 # 04 Y:2024 | 04 | 2024 | INSTALL SUB-METERING EQUIPMENT | $170,944 | $700 | Implemented |
IP0200 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,999 | $1,899 | Not Implemented |
IP0200 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,977 | $921 | Not Implemented |
IP0200 # 07 Y:2024 | 07 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,262 | $328 | Implemented |
IP0200 # 08 Y:2024 | 08 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,218 | $4,577 | Not Implemented |
IP0200 # 09 Y:2024 | 09 | 2024 | INSTALL AUTOMATIC STACK DAMPER | $11,682 | $7,629 | Not Implemented |
IP0200 # 10 Y:2024 | 10 | 2024 | COVER OPEN TANKS | $129 | $246 | Implemented |
IP0200 # 11 Y:2024 | 11 | 2024 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $335 | $705 | Implemented |
MU0056 # 01 Y:2024 | 01 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $42,634 | $3,703 | Not Implemented |
MU0056 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $601 | $1,181 | Not Implemented |
MU0056 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8 | $0 | Not Implemented |
MU0056 # 04 Y:2024 | 04 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $502 | $207 | Implemented |
MU0056 # 05 Y:2024 | 05 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $120 | $187 | Implemented |
MU0056 # 06 Y:2024 | 06 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,122 | $0 | Not Implemented |
MU0056 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,248 | $158,400 | Not Implemented |
UL2410 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,828 | $3,060 | n/a |
UL2410 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $52,875 | $349,289 | n/a |
UL2410 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,202 | $4,083 | n/a |
UL2410 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,357 | $1,200 | n/a |
CM1036 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,303 | $55,212 | n/a |
CM1036 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,289 | $11,963 | n/a |
CM1036 # 03 Y:2024 | 03 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $800 | $12,180 | n/a |