Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0322 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19 | $24,854 | Implemented |
SF0322 # 07 Y:2006 | 07 | 2006 | USE PHOTOCELL CONTROLS | $237 | $345 | Implemented |
SF0322 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $509 | $1,320 | Not Implemented |
SF0322 # 09 Y:2006 | 09 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4 | $15,259 | Implemented |
SF0322 # 10 Y:2006 | 10 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $527 | $1,445 | Not Implemented |
WI0508 # 01 Y:2006 | 01 | 2006 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $147,000 | $0 | Not Implemented |
WI0508 # 02 Y:2006 | 02 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $30,404 | $5,200 | Not Implemented |
WI0508 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,872 | $0 | Not Implemented |
WI0508 # 04 Y:2006 | 04 | 2006 | USE SYNTHETIC LUBRICANT | $4,951 | $0 | Not Implemented |
WI0508 # 05 Y:2006 | 05 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,609 | $2,100 | Not Implemented |
WI0508 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,905 | $1,280 | Not Implemented |
WI0508 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,615 | $0 | Not Implemented |
WI0508 # 08 Y:2006 | 08 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,015 | $3,200 | Not Implemented |
WI0508 # 09 Y:2006 | 09 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,628 | $1,773 | Not Implemented |
WI0508 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $1,154 | $600 | Not Implemented |
WI0508 # 11 Y:2006 | 11 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $467 | $156 | Not Implemented |
MA0595 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,853 | $158,280 | Not Implemented |
MA0595 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,311 | $27,000 | Implemented |
MA0595 # 03 Y:2006 | 03 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,019 | $8,507 | Not Implemented |
MA0595 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $935 | $0 | Implemented |
MA0595 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $62 | $150 | Implemented |
MI0123 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,833 | $56,238 | Not Implemented |
MI0123 # 02 Y:2006 | 02 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,670 | $84 | Implemented |
MI0123 # 03 Y:2006 | 03 | 2006 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,164 | $90 | Not Implemented |
MI0123 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,583 | $140 | Implemented |